Nuclear powerplant licensing reform

    Subtitle
    Comparison of four bills
    Creators and Contributors
    Original Date Issued
    1984
    Place of Origin
    Mode of Issuance
    Extent
    32 pages
    Description
    Three bills to reform the nuclear regulatory process have been submitted to the 98th Congress and draft sections of a fourth have been circulated. All four bills share the same general purposes which include: encouraging the standardization of nuclear powerplant designs; ensuring early and effective public participation in the nuclear powerplant licensing process; promoting the stability of regulatory standards; and improving the efficiency of the licensing process. This report compares the major provisions of the four bills and analyzes their potential impact.,Introduction -- Pre-Approval of Designs. Overview of Pre-Approval of Designs ; Analysis of Pre-Approval of Designs -- Early Site Approval. Overview of Early Site Approval ; Analysis of Early Site Approval -- Combined Construction and Operating Licenses. Overview of Combined Construction and Operating Licenses ; Analysis of Combined Construction and Operating Licenses -- Limits on Modifications and Backfits. Overview of Limits on Modifications and Backfits ; Analysis of Limits on Modifications and Backfits -- Side-By-Side of Pre-Approval of Designs -- Side-By-Side of Early Site Approval -- Side-By-Side of Combined Construction and Operating Licenses -- Side-By-Side of Limits on Modifications and Backfits.,Robert L. Civiak, Specialist in Energy Technology, Science Policy Research Division.,CRS 84-645 SPR,"May 14, 1984.",SuDoc# LC 14. 18/3
    Note
    CRS 84-645 SPR,"May 14, 1984.",SuDoc# LC 14. 18/3
    Resource Type
    Genre
    Identifier
    mu:85069
    Language of Resource