1930 - Track at Brewer Fieldhouse

Image
The opening of Brewer Fieldhouse allowed runners to practice regardless of weather. Different teams--track, football, basketball--shared the Field House according to the seasons of the year. With the addition of the field house, the track team season started at the end of the football season, continuing to the end of school. In years before, however, all the athletes could do before warm weather was maintain their condition. The extra practice was a deciding factor in many meets.
Member of

1929 - Construction of Brewer Fieldhouse

Image
Construction of Brewer Fieldhouse began in 1929, but the facility was not declared open until the following year. Compared to the modern Hearnes Center--which cost $10.5 million to build--Brewer only cost $225,000. Rough stone walls bordered the building, the floor consisted of dirt, and sounds echoed back from the wooden roofs. The building, though, was one of the best back in 1929.
Member of

1892 - Burning of the University of Missouri

Image
The Columns weren't always just columns. Before Jesse Hall was erected, "Academic Hall" stood at the epicenter of campus and its activities. However, in 1892, this building burned down, leaving the six columns.
Member of

1920 - Ivy on the Columns

Image
Company A of the University's R.O.T.C takes a picture for the yearbook in front of the Columns. Addition the 1920 copy of the Savitar.
Member of

1930 - Memorial Union Tower

Image
This picture from the 1930 displays the complete construction of the original tower. However, the tower stood alone for quite sometime. It wasn't until 1950 that the north wing would finally come about.
Member of

1953 - Planning the south wing of Memorial Union

Image
This drawing from the 1953 edition of the Savitar proposes a look at the completed Memorial Union. At the time, though, on the north wing had been built. Only in 1962, with the addition of the south wing, would Memorial Union resemble this drawing.
Member of

1953 - East wing auditorium addition to Jesse Hall

Image
Construction on Jesse in 1953. The East Wing Auditorium was completed in 1954. The original entrance to the auditorium was from the quad on the north side and seated 1,200 people. However, its wooden balcony was removed after being proclaimed a fire hazard. In 1953, renovations took place, and today it seats 1,732 people.
Member of

1915 - "The New Library"

Image
Taken from the 1915 edition of The Savitar, this page details the need for a new, separate library due to Academic Hall's inability to house the rising number of books. Construction of Ellis began in 1913.